Auckland Flood Risk Guide - Using Council GeoMaps

In earlier articles we looked at the four main flood map layers in Auckland and how to do a quick "am I in a flood zone?" check using Relab and Auckland Council's Flood Viewer.

This guide goes a level deeper. It's for those who want to dig into the technical detail behind the maps using GeoMaps – the same tool used by engineers, planners and council staff.

Since the January 2023 events, Auckland has also progressed Plan Change 120 (PC120), which updates how the Unitary Plan manages natural hazards. Flood models you see in GeoMaps now feed into a risk-based framework that classifies risk as Significant, Potentially tolerable or Acceptable, and guides where council is comfortable with new development.

Below, we'll walk through:

  • How to set up GeoMaps correctly
  • Which layers and attributes matter
  • How this links to PC120's natural hazard rules
  • When to stop DIY and bring in a Chartered Professional Engineer (CPEng)

Why bother with GeoMaps if I have Relab and Flood Viewer?

Relab and Flood Viewer are the best starting points:

  • Relab – quick, integrated check across flood hazard, services, contours and property data.
  • Flood Viewer – simple public map from Council with floodplains, flood prone areas, overland flow paths and coastal inundation.

But when you're making bigger decisions – development feasibility, complex renovations, risk for multi-unit sites – you need to understand:

  • How much water a flow path carries
  • How big the catchment is
  • How old the modelling is and which climate change scenarios it uses

That level of detail only comes from GeoMaps and the underlying modelling reports. This is also the level of detail planners and engineers are using when they apply PC120's E36 Natural Hazards provisions to your site.

Step 1: Setting up GeoMaps the right way

Start with Auckland Council's GeoMaps:

  1. Open GeoMaps in your browser.
  2. Search for the property (address or legal description).
  3. Switch the map theme / layer group to something like "Assets" or "Hydrology / Flooding" depending on the current interface.
  4. Turn on these core layers:
    • Floodplains
    • Flood prone areas
    • Overland flow paths
  5. Adjust transparency so you can see parcel boundaries, streets and aerial imagery underneath.

You should now see a similar picture to Flood Viewer – but with more control over layers and the ability to query them for model details.

Step 2: Understanding what you're seeing

Once the layers are on, zoom in around your site and ask:

  • How much of the property is covered by floodplain shading?
  • Are there overland flow paths crossing likely building platforms, driveways or garages?
  • Are there flood prone "bathtubs" on or near the house?
  • Is the property also in a coastal inundation area?

Remember:

  • Floodplains = where water spreads out in a big 1% AEP event.
  • Flood prone areas = local ponding in low spots.
  • Overland flow paths = stormwater's natural overland routes when pipes are at capacity.
  • Coastal inundation = low-lying coastal risk from storm surge/sea level rise.

At this stage you're still at the "picture level" – GeoMaps becomes really powerful when you start using the Identify / Query tool on these layers.

Step 3: Use the Query tool – model age, climate change and flows

Click on the Identify/Query tool and then click on the flood layer (floodplain, flood prone area or overland flow path) near or on your site. A panel will appear with attributes from the model.

Key things to look for:

For floodplains

  • Model name and year – older models are more likely to be revisited or updated.
  • Event type – usually a 1% AEP event (sometimes multiple events).
  • Climate change assumptions – whether the model includes allowances for climate change and which scenario was used (e.g. projected increases in rainfall intensity).
  • Report link – look for a PDF report link; this contains full details of the modelling.

For flood prone areas

  • Ponding depth – how deep water is predicted to get.
  • Ponding duration – if available, how long it is likely to remain.
  • Spill elevation – the level at which water would overtop and start flowing out.

For overland flow paths

  • Catchment area (m² / ha) – larger catchments = more water.
  • Peak flow (m³/s) – gives you an idea of how powerful flows can be. In advisory work after the 2023 events, flows of around 1.5–2.5 m³/s are often treated as a serious red flag – enough to move vehicles and cause structural damage.
  • Flow direction – combined with contours, this tells you what's upstream and downstream of your site.

This is the "under the hood" data that sits behind the coloured polygons you see in simpler tools.

Step 4: Connecting GeoMaps to PC120's risk framework

PC120 doesn't change the GeoMaps interface, but it changes the planning context in which these models are used.

Under PC120's proposed updates to E36 Natural Hazards:

  • Natural hazard risk (including flooding) is described in terms of Significant, Potentially tolerable and Acceptable risk.
  • Policies aim to avoid significant risk to people and property, and only enable subdivision, use and development where risk is tolerable or acceptable.
  • There is a strong emphasis on maintaining the function of floodplains and overland flow paths, and using more nature-based solutions where possible.

In practice, when council and consultants look at a site they are interpreting the same GeoMaps models you are looking at – but through this PC120 lens. Depth, velocity, catchment size and exposure all contribute to whether a site is seen as high, moderate or lower risk.

If your GeoMaps query shows large catchment areas, high peak flows, deep floodplain shading and critical overland flow paths, expect greater scrutiny in any consent process.

Step 5: Use the PC120 map viewer alongside GeoMaps

GeoMaps is about the hazard modelling itself. The PC120 map viewer is about how PC120 proposes to apply that information through zones, layers and qualifying matters.

As a complement to GeoMaps:

  1. Open the PC120 map viewer.
  2. Search for the property.
  3. Click on the site to open the Property Summary.
  4. Review:
    • The proposed zone under PC120.
    • Any management layers (e.g. intensification areas).
    • Any spatially identified qualifying matters that apply – including where proposed flood-related qualifying matters (e.g. floodplain hazard) are mapped.

For some sites, flood-related qualifying matters are only visible in this Property Summary, so it's worth a quick check whenever GeoMaps shows significant flood hazards.

Not all flood zones are equal

One of the biggest mistakes is treating any blue shading as a binary "no-go". In reality, there's a spectrum:

  • Some floodplains function as deliberate retention areas – they fill in extreme events but may not put dwellings at serious risk.
  • Some overland flow paths skirt the edge of a large lot without ever touching potential building platforms.
  • Some flood prone areas are shallow ponding on lawns, not floor-level flooding.

GeoMaps + the model reports help you figure out which situation you're dealing with. Combined with PC120's risk language, you're asking:

"Is this more like Significant risk to life and property, or is it something potentially tolerable with good design and mitigation?"

That's a very different question to "is there any blue on the map?"

When to involve an expert

GeoMaps is powerful, but it doesn't replace professional judgement. You should seriously consider engaging a Chartered Professional Engineer (CPEng) experienced in flood risk when:

  • More than ~25% of the site lies within a floodplain or multiple flood layers overlap.
  • An overland flow path crosses your existing or proposed building platform, or key access.
  • Peak flows on or near the site are high (around or above 1.5–2.5 m³/s) and catchments are large.
  • The site is in a floodplain and coastal inundation area, or at the bottom of a catchment where many flows converge.
  • Council has already signalled concerns, or previous reports/LIM notes indicate significant risk.

A flood engineer will:

  • Interpret the GeoMaps models in detail for your site.
  • Visit the property to ground-truth assumptions.
  • Provide a site-specific flood risk assessment, and if needed, carry out new modelling to support consent applications or design work.

GeoMaps + Relab: a practical workflow

In practice, a lot of investors, developers and agents find this workflow works well:

  1. Relab – use Relab's flood hazard, services and contour overlays to quickly screen a list of properties and narrow down your shortlist.
  2. Flood Viewer – cross-check that what you see in Relab matches Council's public viewer.
  3. GeoMaps – for shortlisted properties, use the process above to dig into model age, catchments, flows and floodplain behaviour.
  4. PC120 map viewer – check whether PC120 proposes additional constraints or qualifying matters related to flooding on the site.
  5. Experts – if the combination of mapping and context suggests higher risk, bring in a CPEng flood engineer early.

That way, you're not drowning in technical detail for every property – but you also avoid walking blind into high-risk sites.

Wrapping up

GeoMaps is the engine room behind Auckland's simpler flood maps. Used well, it tells you:

  • How often a site is likely to flood
  • How deep and how fast water may move
  • How big the contributing catchment is
  • How recent and robust the modelling is

In a PC120 world, that detail now sits directly behind planning decisions about where intensification is appropriate and where risk is too high.

If you're making significant decisions about buying, developing or funding property in Auckland, learn to read GeoMaps – and know when to pass the baton to a flood risk engineer.

Important:

This guide summarises how to use GeoMaps and related tools in the context of PC120's natural hazard provisions in general terms. It is general information only and is not planning, legal, engineering or insurance advice.

PC120 is still progressing through the formal plan change process. Before making decisions about buying, selling or developing, always: